When a packaging machine stops mid-shift, where should the team record it? Follow one factory example from a missed service to a ₹7,500 repair in ERPNext.

 · 3 min read

A packaging machine stops at 10:00 and returns to production at 14:30. The technician replaces two bearings, and an outside engineer sends a labour bill. Where should the supervisor record the 4½ hours lost? What happens to the service inspection that was already due?

Use Asset Maintenance for the scheduled inspection and Asset Repair for the breakdown. Keep both records against the same asset tag. The maintenance supervisor can then see whether the scheduled work happened, while accounts can trace the cost of putting the machine back into service.

Schedule work that has a due date

Start with one identifiable machine. Give it a tag such as PACK-01, record its location and assign responsibility. In its Asset record, enable maintenance. Then create an Asset Maintenance plan, select the maintenance team and add the tasks, dates, frequency and person responsible. Use service intervals from the manufacturer and your factory’s approved maintenance plan.

For example, suppose PACK-01 has an inspection due on 20 November. When the technician completes it, they can record the actual date and result in the maintenance log. If it happens on 22 November, preserve both dates. At the weekly review the supervisor can see that the job was finished two days late and follow up on the reason.

Record the breakdown and its cost

Open an Asset Repair for PACK-01. Record when the machine failed, the fault found, the work done and when it returned to service. Link the applicable purchase invoice for external work and record stock items consumed through the repair workflow supported by your installation.

What happened Sample entry
Machine unavailable 10:00 to 14:30 on the same day
Elapsed breakdown time 4 hours 30 minutes
Two spare bearings 2 × ₹2,000 = ₹4,000
Outside engineer’s labour ₹3,500
Total repair cost in this example ₹7,500 before any applicable tax

Before posting another stock issue or expense, check what the repair and linked purchase invoice have already recorded. For this example the store should show two bearings used, and the cost review should explain ₹7,500. If the log shows ₹11,500, check whether someone has counted the ₹4,000 of bearings twice.

Measure what the production team actually lost

Elapsed breakdown time and lost production time can differ. If the machine was scheduled to run throughout those 4½ hours, all 4½ count as lost production time. If one hour fell during a planned non-production period, only 3½ hours overlapped scheduled production.

For a month with 160 scheduled machine hours and 4½ hours of unplanned loss, availability under that definition is (160 − 4.5) ÷ 160 = 97.19%. Write down the definition before comparing machines or shifts. For a service-completion measure, count each scheduled task once. If 20 tasks were due and 17 were finished on time, on-time completion was 85%.

Test the workflow with one machine

  1. Schedule an inspection for PACK-01 and assign a technician. Check who sees the due task.
  2. Record a late completion. Confirm the supervisor can compare the due date with the actual date.
  3. In a test company, record the example breakdown, two spare bearings and one labour bill. Check the stock movement and cost.
  4. Ask the production planner which orders the stoppage affects. Agree who updates the schedule and informs dispatch.
  5. Open the machine’s maintenance and repair history together. A repeated bearing failure is easier to investigate when the service dates, fault descriptions and parts used are available.

For implementation details, see ERPNext asset management and ERPNext manufacturing. To discuss your factory workflow, contact Thirvu Soft.

Frappe documents the standard records in Asset Maintenance and Asset Repair.


No comments yet.

Add a comment
Ctrl+Enter to add comment

Let's build together

Ready to run your business on one connected platform?

Tell us how you work today. We'll show you how ERPNext, a mobile app or an integration can take the manual work out of it.

Or build your ERP blueprint in 60 seconds