Engineering Drawing Revisions in ERP Software for Coimbatore Job Shops

A customer changes a bore dimension halfway through a 60-part order. Trace every affected piece before releasing the new drawing to a machine or vendor.

 · 2 min read

A Coimbatore CNC job shop receives drawing Rev C while a 60-piece order is running to Rev B. Replacing the PDF on the item master tells the next operator which file to open. It leaves the owner with a harder question. Which pieces have already been made, and what can still ship?

Account for the whole order before changing instructions

In this illustrative order, the customer changes a bore dimension. Set aside affected output and record the change notice, drawing identifier, receipt time and customer contact. Engineering must establish whether the change applies to this order, a particular lot or future orders only. Until that decision is recorded, dispatch should know which pieces need review.

Position when Rev C arrivesQuantityQuestion for the job owner
Finished to Rev B18Has the customer accepted these, or is rework required?
At an outside machining vendor12Which operations have actually started?
On the shop floor20Which pieces have passed the changed operation?
Unstarted blanks10Who can release the Rev C instructions?

These groups are mutually exclusive and total 60. If a vendor has returned parts since the last entry, reconcile the physical count first. Otherwise the same pieces can appear at the vendor and on your shop floor.

Give each quantity a written disposition

Suppose the customer accepts the 18 finished pieces under a written concession. Link that approval to the specific lot and quantity. It does not automatically cover the 12 parts with the vendor. Ask the vendor to acknowledge the revised drawing and report how many pieces have passed the affected operation. Quality can then record its inspection, rework or hold decision against that quantity.

Release the ten unstarted blanks on an instruction carrying Rev C. Preserve the earlier drawing on the completed operation history. If a rework operation adds machine time, put its hours on a separate record so the estimator can explain the difference at job close.

What to ask for in a job shop ERP demo

  • Open one finished piece or lot and trace it to the drawing used, inspection record and dispatch approval.
  • Log in as an operator and identify the released drawing without relying on a file name like “final-new”.
  • Try to dispatch a held lot. Record whether the system blocks it, flags it or depends on a manual check.
  • Print the vendor instruction and verify the drawing revision is visible on the paper actually sent outside.

Revision tracking can involve document control, permissions and a configured approval workflow. Ask the vendor to identify any extra setup. Our engineering manufacturing guide covers the wider order flow. For local vendor selection, see the Coimbatore ERP software buyer’s guide.


No comments yet.

Add a comment
Ctrl+Enter to add comment

Let's build together

Ready to run your business on one connected platform?

Tell us how you work today. We'll show you how ERPNext, a mobile app or an integration can take the manual work out of it.

Or build your ERP blueprint in 60 seconds